Arana Gulch Master Plan
Draft Environmental Impact Report (EIR)
(Please allow time for files to download.)

Draft EIR Text and Tables

 

Cover and Table of Contents

Ch. 1 - 2

Introduction and Summary

Ch. 3

Project Description

Ch. 4

Environmental Setting, Impacts and Mitigation Measures

Land Use and Planning
Biological Resources
Geology and Soils
Hydrology and Water Quality
Aesthetics
Recreation
Transportation/Circulation
Air Quality
Noise
Cultural Resources
Other Impacts

Ch. 5 - 8

Alternatives, CEQA Considerations, Report Preparation, and Bibliography

Figures

3-1

Site Location

3-2

Existing Setting

3-3

Habitat Areas

3-4

Management Areas

3-5

Proposed Trail System

3-6

Preliminary Trail Alignment Canyon and Creek View Trail

3-7

Preliminary Cross Sections Canyon and Creek View Trail (A-D)

3-8

Preliminary Cross Sections of Canyon and Creek View Trail (E-H)

4.1-1

Existing City General Plan Designations

4.1-2

Existing County General Plan Designations

4.1-3

Existing Zoning Designations

4.2-1

Habitat Areas

4.2-2

Wildlife Resources

4.2-3

Tarplant Subpopulation Areas

4.2-4

Tarplant Census 2004

4.2-5

Tarplant Census 2005

4.3-1

On-site Soils

4.5-1

Photo and Simulation Locations

4.5-2

Views of Site

4.5-3

Visual Simulation No. 1

4.5-4

Visual Simulation No. 2

4.5-5

Visual Simulation No. 3

4.5-6

Visual Simulation No. 4

6-1

Cumulative Projects

Appendices

A -C

Appendices

A

NOP and Responses and Summary of Public Comments

B

Table of Contents for Arana Gulch Master Plan (Draft)

C

Fall Creek Engineering Calculations

 

Report Website Problems ( Broken Links, Page Not Found, etc.)
To: parksandrec@ci.santa-cruz.ca.us

BACK TO TOP